SUB-SLAB DEPRESSURIZATION SYSTEM INSTALLATION

Client:  Pontiac West Design Engineer:  Hull & Associates Completed:  2018 Hired as the General Contractor, Environmental Remediation Contractor installed a sub-slab depressurization system (SSDS) in a 533,000 square-foot active facility. Hull & Associates designed the SSDS to address the chemicals of concern (COC) detected in the soil beneath the existing building slab. This system included…

ABANDONED GAS STATION

Bexley, Ohio Design Engineer: Cox-Colvin & Associates Client: City of Bexley Completed: 2018 The City of Bexley hired Environmental Remediation Contractor as the Environmental General Contractor for this project to remediate the former Sunoco petroleum service station. Gasoline underground storage tanks (USTs) were previously removed; however, historical releases had contaminated both soil and groundwater at…

JOHNS MANVILLE COKER LANDFILL 1, 2 & 3 REPAIR

Athens, Tennessee Client:Johns Manville Design Engineer:AECOM & TetraTech Completed:2015 ERC was hired as the General Contractor to perform repairs at 3 landfills in Tennessee for Johns Manville. The project consisted of replacing the leachate sprinkler systems, the leachate collection piping and lift stations, installing new landfill toe drains and re-capping large portions of the landfill.…