Athens, Tennessee
Client:Johns Manville
Design Engineer:AECOM & TetraTech
Completed:2015

ERC was hired as the General Contractor to perform repairs at 3 landfills in Tennessee for Johns Manville. The project consisted of replacing the leachate sprinkler systems, the leachate collection piping and lift stations, installing new landfill toe drains and re-capping large portions of the landfill. All waste encountered during the operation was either reappropriated into the landfill or hauled off for disposal. We hired and managed an electrical subcontractor to install a new electrical drop and install new power to the 3 landfills and their individual controls.

Services
Utility locating, abandonment& relocation
Concrete pad construction
Installation of above groundleachate tanks
Lift station, pumps andcontrols
HDPE pipe welding andinstallation
Electrical drop and installation
Onsite borrow, placement andcompaction for the landfill cap
Clearing & Grubbing
Erosion Control
Seeding & Mulching