Former Wood Treating Facility Remediation & RCRA Closure

Washington Court House, Ohio | Hazardous Waste Remediation | CCA Soil Cleanup | RCRA Closure | Site Restoration

Environmental Remediation Contractor (ERC) served as general contractor for the remediation of a former lumber pressure-treating facility in Washington Court House, Ohio.

For years, the facility treated lumber with chromated copper arsenate (CCA). That process left F035-listed hazardous waste in the soil, with chromium, hexavalent chromium, arsenic, and lead.

ERC removed 2,700 tons of impacted soil for off-site treatment and replaced it with clean fill. The site met residential cleanup standards and achieved RCRA closure through Ohio EPA.

Project at a Glance

  • Location: Washington Court House, Ohio
  • Client: Property owner
  • Design Engineer: Engineering and environmental consulting firm
  • General Contractor: Environmental Remediation Contractor (ERC)

Key Project Results

  • 2,700 tons of impacted soil removed and sent off site for treatment
  • 2,700 tons of clean fill imported and placed
  • Site remediated to residential use standards
  • RCRA closure achieved through Ohio EPA
  • Groundwater containment and monitoring measures installed

What Is CCA and Why Is It a Concern?

Chromated copper arsenate (CCA) is a wood preservative that gives treated lumber a green color. The treating process can leave drippage and residues containing chromium, hexavalent chromium, arsenic, and lead, which are classified as F035-listed hazardous waste.

What Is RCRA Closure?

RCRA (the Resource Conservation and Recovery Act) governs hazardous waste. RCRA closure means a site has been cleaned up and formally released by regulators. Here, Ohio EPA granted closure after remediation met residential standards.

How Was the Impacted Soil Handled?

ERC excavated 2,700 tons of impacted soil and arranged its safe transport for off-site treatment, in full compliance with hazardous waste rules. The site was then restored with 2,700 tons of clean fill.

How Was Groundwater Protected?

ERC installed containment measures and monitoring systems to keep contamination from spreading further, and coordinated with regulators throughout to meet cleanup and permitting requirements.

Why Was This Project Complex?

ERC had to manage several conditions at once:

  • F035-listed hazardous waste
  • Chromium, arsenic, and lead in soil
  • Groundwater protection
  • Residential cleanup standards
  • Regulatory coordination for RCRA closure

Who Cleans Up Former Wood Treating Sites in Ohio?

Wood treating sites need contractors experienced with listed hazardous waste, groundwater protection, and regulatory closure.

ERC performs hazardous waste remediation, metals cleanup, and site restoration for property owners, developers, and environmental consultants across Ohio and the region.

What Services Did ERC Provide on This Project?

  • Hazardous Waste Management
  • Impacted Soil Excavation and Off-Site Treatment
  • Groundwater Containment and Monitoring
  • Regulatory Coordination
  • Clean Fill Placement
  • Site Restoration

Need a Hazardous Waste Site Closed Out?

Environmental Remediation Contractor provides hazardous waste remediation from excavation through restoration and regulatory closure.

ERC works with property owners, developers, and consultants to clean up impacted sites and get them released for reuse.