Ecological Restoration Services in Ohio

ecological restoration img

Conditions vary widely across Ohio, so successful field work starts with a plan built around the property rather than a one-size-fits-all scope. Ohio’s stream corridors, developed floodplains, aging infrastructure, and legacy industrial land can be affected by erosion, development, altered drainage, and aging infrastructure. ERC provides ecological restoration for urban waterways, former commercial properties, industrial sites, and transportation corridors, with services that rebuild stream function, restore wetlands, and stabilize shorelines, slopes, and banks.

Ohio projects often require careful coordination around active facilities, public rights-of-way, waterways, and redevelopment schedules. ERC can carry the work from constructability planning through grading, in-stream installation, planting, and final stabilization with one self-performing team.

  • null
    Stream, river & wetland restoration
  • null
    Dam removal & reservoir, canal & shoreline work
  • null
    Slope & bank stabilization
  • null
    Self-performing crews – one team from design through construction

Our Ecological Restoration Capabilities

Stream and River Restoration image
Stream and River Restoration image

Stream & River Restoration

  • Channel restoration & daylighting
  • Bank stabilization & grading
  • Habitat & water quality improvement
  • In-stream structure installation
More Detail
Wetland Creation Restoration
Wetland Creation Restoration

Wetland Creation & Restoration

  • Constructed wetlands
  • Wetland restoration & mitigation
  • Stormwater & water quality treatment
  • Native planting & establishment
More Detail
Dams Shorelines Slope Stabilization
Dams Shorelines Slope Stabilization

Dams, Shorelines & Slope Stabilization

  • Dam removal & repair
  • Reservoir, canal & shoreline work
  • Slope & landslide stabilization
  • Erosion control
More Detail

Why Property Owners & Agencies Choose ERC

One Team From Plan to Field

For ecological restoration in Ohio, ERC uses one accountable field team to reduce handoffs and keep changing site conditions connected to the work plan.

Relevant Project Experience

ERC is headquartered in Columbus, Ohio, and has completed remediation, restoration, and emergency response projects across the state for more than 15 years – for municipal, industrial, and private clients alike.

Trained Environmental Field Crews

Field employees receive 40-hour HAZWOPER training and ERC supports work throughout Ohio, Illinois, Indiana, Kansas, Kentucky, Michigan, Missouri, Pennsylvania, and Wisconsin.

Frequently Asked Questions

ERC handles stream and river restoration, wetland creation and restoration, shoreline and dam work, slope or bank stabilization, erosion control, and related site restoration in Ohio. These services can support urban waterways, former commercial properties, industrial sites, and transportation corridors.

Start with the location, available plans, photographs, known permitting status, site-access limitations, schedule, and the problem you need corrected. Ohio projects often require careful coordination around active facilities, public rights-of-way, waterways, and redevelopment schedules. An early site review helps ERC understand constructability and equipment needs.

Yes. Depending on site goals and design requirements, ERC can perform stream-channel work, bank stabilization, wetland creation or restoration, shoreline work, dam-related work, native planting, and erosion control in Ohio. The final scope should be based on the site’s design, permits, access, and existing conditions.

ERC provides ecological restoration in Ohio within its nine-state service area. Mobilization timing and equipment needs depend on the exact location, urgency, access, and scope, so ERC should confirm logistics for each property before scheduling.

ERC employees supporting ecological restoration receive 40-hour HAZWOPER training and annual refreshers, along with training that may include RCRA, DOT, confined-space entry, respiratory protection, First Aid and CPR, and project-specific requirements. The field plan also addresses hazards and controls identified for the individual site.

Send the Ohio property address, a concise description of the ecological restoration need, photographs, available reports or drawings, access limitations, target schedule, and your contact information. ERC can review those details and determine whether a site visit or additional documentation is needed.

Connect With Us

Reach out now – someone from our team will get in touch within 24 hours.

Name(Required)
Email(Required)

Certifications and Awards

I am looking for:
in