design-buildClient:  Pontiac West 

Design Engineer:  Hull & Associates

Completed:  2018

ENVIRONMENTAL REMEDIATION CONTRACTOR  was hired as the General Contractor to install a sub-slab depressurization system (SSDS) in a 533,000 square foot active facility. The SSDS was designed by Hull & Associates to address the chemicals of concern (COC) detected in the soil beneath the existing building slab. This system included trenching, installing 1,157′ of the horizontal pipe, vacuum blowers, 10 sub-slab extraction points, installation of vertical extraction riser connections to each extraction point and 186′ of above ground piping connecting the extraction risers to the vacuum blowers.

Services:

• Installation of Sub-Slab Depressurization System
(Extraction Points & Risers)
• Installation of Reinforced Concrete
• Sub-Slab Soils Materials Management, Off-Site Transportation & Disposal
• Groundwater/Residual Water Management, Removal & Disposal
• Installation of Overhead Extraction Piping
• Concrete Slab Joint & Crack Sealing
• Installation of SSDS Equipment Enclosure Unit
• Installation of protective bollards

 