A Force for Nature

CREEK CHANNEL & FLOODPLAIN RESTORATION PROJECT

design-buildClient: City of Lebanon, Ohio
Design Engineer: Burgess & Niple
Completed: 2019

Design build

 

The Environmental Remediation Contractor and Burgess & Niple team was selected as the design-build team to complete the design, permitting and construction work along Turtle Creek. The scope of work included the removal of a failing sheet pile wall, clearing, and grubbing, excavation/embankment, re-alignment of the stream, installation of instream structures and rip-rap slope protection. During the removal of the sheet pile wall and slope excavation, ERC encountered petroleum impacted soils, which were efficiently remediated by our trained and experienced crew. This project is a prime example of the ERC Team’s ability to perform design-build services, bank stabilization, stream restoration, and remediation services on one project site.