Case Studies

STREAM RESTORATION | BANK STABILIZATION

By Braeden Hurley

Blacklick Creek – Reynoldsburg, Ohio

Through stream restoration and bank stabilization, as the Environmental General Contractor, we were able to repair a dangerous situation facing an apartment complex in Central Ohio. The adjacent Blacklick Creek had eroded the bank to the point that a 40 foot cliff endangered both people and property. We cleared the area, relocated utilities, and diverted the stream. Next, we built a reinforced modular block wall, filled and graded the area, and placed rock channel protection in the creek to protect the bank. After completing the stream restoration and bank stabilization, the area is now safe leading to a fenced creek overlook.

temp-post-image temp-post-image temp-post-imagetemp-post-image




Name

Email

Subject

Message

Please provide the required field.

Enter both words below, separated by a space

Please enter the words or numbers you hear

Can't read the words below? Try different words or an audio captcha

This is a standard security test that we use to prevent spammers from submitting fake response More Help