ERC was hired as the General Contractor to restore the Fetter's Run park in Lancaster, Ohio. This involved clearing & grubbing land adjacent to the stream. Demolition of an existing bike path & pavilion then removal of an existing playground. Excavation of stream bank to lay back slope to create a floodplain bench for the stream. We then installed in stream structures including, j-hooks, rock weirs & three clusters of eddy rocks. Next over 4,000 SF of articulating concrete block mat was installed for slope stabilization. The project was finished by installing a new bike path followed by planting various trees & shrubs then seeding & mulching the entire site.

temp-post-image

Services

  • Clearing & Grubbing

  • Demolition

  • Debris Removal

  • Excavation

  • Bank stabilization

  • Compaction

  • Riparian corridor plantings

  • Seeding and mulching

  • Sediment control